You can become a Supporting Member.
CNC shop promised me this month for final prototyping.
January is almost over, any new news/estimates about when the heatsinks will be done?
I'm sorry to bring this to you. CNC shop informed me today that they will not be able to produce my prototype as promised because they are desperately trying to catch up all back log orders, when they were closed for over a month due to major flooding in Bangkok. I try to ask them for rough ETA but they couldn't tell me. I'm as anxious as you are believe me, but situation is not the same after major floods. Hang in there I will let you know when they become available.
I am planning on using an XM-L on a PCB and not sure which sink I need, the DHS flat top or the P7 flat top?
and will this work well with an aspheric lens? (not sure the post height is good or not for a good beam)
Thanks