js
Flashlight Enthusiast
I have finally done another update to the first post, and the payment/order list is now up-to-date as of this post, although I am expecting at least one check in today's mail or possibly tomorrows, and I will get that (and any other payments) updated the next time I do an edit.
The Twinfly 12V 5A power supplies are on their way to me, and the Hitecs are on their way to Bill, so that only leaves the LVR's which have still not arrived. If they do not come in todays mail, I will call Willie this afternoon to get an update. I also need to get my hands on a fair square footage of 1/16" thick copper sheet, but I doubt this will be a problem.
I am still in the middle of assembling packs, but have not yet done the electrical connections to turn a physical 3x3 into a 9s configuration. Plus, when I get the regulators, I will have a lot of work to solder lead wires onto the MOSFETS and then to the boards, as well as gluing on the silicon rubber strips so that the boards mate safely and securely on the packs. And lots of other work to wire everything up and make the end caps and charging cables and so on.
Still, I have no reason to change my estimate of one month till all orders are delivered, from the time I get ALL the supplies. I think I can make that without any trouble, and I hope to better it. Feel free to post questions or ask for updates or whatnot. Thanks everyone.
The Twinfly 12V 5A power supplies are on their way to me, and the Hitecs are on their way to Bill, so that only leaves the LVR's which have still not arrived. If they do not come in todays mail, I will call Willie this afternoon to get an update. I also need to get my hands on a fair square footage of 1/16" thick copper sheet, but I doubt this will be a problem.
I am still in the middle of assembling packs, but have not yet done the electrical connections to turn a physical 3x3 into a 9s configuration. Plus, when I get the regulators, I will have a lot of work to solder lead wires onto the MOSFETS and then to the boards, as well as gluing on the silicon rubber strips so that the boards mate safely and securely on the packs. And lots of other work to wire everything up and make the end caps and charging cables and so on.
Still, I have no reason to change my estimate of one month till all orders are delivered, from the time I get ALL the supplies. I think I can make that without any trouble, and I hope to better it. Feel free to post questions or ask for updates or whatnot. Thanks everyone.