Guys! Relax! I'm still working through the stack. I received a LOT more work than I anticipated, so instead of holding people off, I took everyone's work in an attempt to make people happy. So in the end, nobody's happy! Haha. Well, almost.
I'm going through everyone's project and shipping them as completed. Obviously, some are not complete yet. I've had to slow down some of the more complex jobs (cuts and rethreads) in an effort to clear out the simpler jobs (17670/18650 boring).
I know it's not ideal, but setting up each light for a job that's square, true and concentric takes a fair bit of time, and cutting clean threads (especially internal threads) takes a lot of time. Right now I'm stuck in "good, cheap, fast... Pick two."
At $20-$35 per operation, plus I pay shipping, I'm not exactly making money here so I hope even with the extended schedule I hope everyone still feels like they're receiving a good value. If not, PM me, nobody can say I haven't been willing to work things out to their favor. Okay?