AilSnail
Flashlight Enthusiast
On the 1w headlamp I am making, I am contemplating using a bb400/500, instead of direct drive/pot. The leads to the battery pack will probably be around 1/2 meter and up. I am pondering whether it be best to have the board close to the batteries, or close to the emitter. Also, what cap to use, if any, in the preferred arrangement.
Thanks, Sigurd.
Thanks, Sigurd.