Re: Taking Orders/Payment : min-T CNC Bike Light
Progress report:
So far I have 5 units fully built & ready for programing. Hope to ship these Monday / Tuesday.
The other 5 units have their faces done & ready for wiring.
It was a lot more work that I first thought.... 2 weeks was a bit optimistic. As this is still a proto run, I forgot the first few would be a bit slower, till I got the build process down pat.
I have gone over board a little on the water proofing, this time... as its a new product & don't have a lot of rider feedback @ the moment...
I think of you guys @ CPF as 'test riders'... knowing more than the average light user, you will help me tweek the product so it can be better each run we do... this is reflected in the price you guys are paying.
unfortunately, when the final 'retail sale' version comes out, it will be more expensive... this is mainly due to the fact that the housings are fully CNC made & the cost for Dom to book these huge machines is very expensive & time consuming. @ the moment Dom can only make one light @ a time... & when you are dealing with a cutter that cuts 0.1mm each sweep... the time really adds up...
Anyway, hope to have the rest built & shipped by next weekend...
thanks for waiting
best
Ktronik
Progress report:
So far I have 5 units fully built & ready for programing. Hope to ship these Monday / Tuesday.
The other 5 units have their faces done & ready for wiring.
It was a lot more work that I first thought.... 2 weeks was a bit optimistic. As this is still a proto run, I forgot the first few would be a bit slower, till I got the build process down pat.
I have gone over board a little on the water proofing, this time... as its a new product & don't have a lot of rider feedback @ the moment...
I think of you guys @ CPF as 'test riders'... knowing more than the average light user, you will help me tweek the product so it can be better each run we do... this is reflected in the price you guys are paying.
unfortunately, when the final 'retail sale' version comes out, it will be more expensive... this is mainly due to the fact that the housings are fully CNC made & the cost for Dom to book these huge machines is very expensive & time consuming. @ the moment Dom can only make one light @ a time... & when you are dealing with a cutter that cuts 0.1mm each sweep... the time really adds up...
Anyway, hope to have the rest built & shipped by next weekend...
thanks for waiting
best
Ktronik
Last edited: