Shafting material

Candle Power Forums

Help Support Candle Power:

precisionworks

Flashaholic
Joined
Apr 19, 2007
Messages
6,623
City & State/Province
Benton Illinois
Making custom shafts, or making replacement shafts, is a bread & butter item for a job shop like mine. Just got a phone call to make one up ASAP that will ship UPS overnight :D No TV watching this evening.

My two primary shafting materials are 1144 Stressproof and 4140HT. Some properties are similar, others are different.

For ease of machining, nothing beats 1144 when a high tensile strength steel is needed ... 115 ksi is the figure often noted. For many shafts, that is more than adequate. Machinability is 70% of the standard 1212. Turning speed is about 200 sfpm with carbide tooling. 1144 is considered non-weldable because of the lead & sulfur content.

4140HT (Heat Treated) has even better fatigue properties than 1144, plus higher surface hardness (28-32 HRc). Machinability is 50%-55% of the standard 1212. Turning speed is about 100 sfpm with carbide. It is readily welded without problem. Tensile runs about 120 ksi - 140 ksi.

4140HT machines much like W1 or O1 tool steel, which is to say not too bad. It is a medium carbon alloy steel, not prone to work hardening unless one gets careless with dull tooling. An interesting point, from the Lindquist Steels website, is this:

FLAME-HARDENING - Small surface areas on tools made of 4140HT can be hardened by merely heating with any oxyacetylene torch for a few seconds (long enough to heat the surface to a cherry red color, about 1500°F). No quenching is required. The portion of the steel heated will harden to Rockwell C55/60 because of the rapid cooling produced by the conduction of heat from the small heated spot into the larger adjacent areas which have not been heated.

FWIW, both 1144 & 4140HT have about the same pricing structure. If you need smaller quantities, like 3' or 6' (or some multiple of 6') a good supplier is http://www.metalsupermarkets.com/metalguide.aspx

Pricing on the phone is less than pricing on the web :eek:
 
Finished the last op at 2100 and called the customer, who arrived in minutes ... he was a happy camper & placed an order for five more of the same shaft :D

This wasn't a difficult part, 1.625" OD for 4" length, then 1.130" for 1.5". Two bores, one reamed hole for a dowel pin, two threaded holes for set screws. Time was 75 minutes, starting with 1.875" OD stock and taking .250" off the diameter per roughing pass. Sort of interesting, as each op builds on the prior op & the callouts are tight. Walked the dogs, ate dinner & turned the lights off at midnight :nana:
 
As an Amazon Associate we earn from qualifying purchases. Product prices and availability are accurate as of the date/time indicated and are subject to change.
Back
Top