ambientmind
Enlightened
- Joined
- May 8, 2007
- Messages
- 465
I've been putting this mod together in my head for months now, and its finally coming to fruition. This part of it is for the standard M3 head which will house a M-WG bin MC-E driven at 2A by a Shark Buck. The EVA optics provide an almost perfect fit in the head, and I'm designing it so that the optics will be easily swappable between the D, M and W beams. The hard part was machining the heatsink, and since I don't have a lathe I had to get creative. I made a jig out of some scrap aluminum and bolts to hold everything together. I clamped an old AC drill into the vice, leveled it and started turning the aluminum using various files to shape it. I was more than pleased with the results. I'll post more photos as the mod continues, but here is the progress so far:
Next will be the turbohead...all I know so far is a 3A shark buck will be powering it....
Next will be the turbohead...all I know so far is a 3A shark buck will be powering it....
Last edited: